FOB Price
Get Latest Price380000 ~ 3e+06 / Set
|1 Set Minimum Order
Country:
China
Model No:
DCI015
FOB Price:
380000 ~ 3e+06 / Set Get Latest Price
Place of Origin:
-
Price for Minimum Order:
380000 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
seaworthy packing
Delivery Time:
4 months
Supplying Ability:
4 Set per Year
Payment Type:
T/T, L/C
Product Group :
Contact Person Ms. Susan
Lianmeng West, Shijiazhuang, Hebei
1)Raw material blending; |
2)Shaping; |
3)Wet board/panel conveying; |
4)Drying; |
5)Dry board/panel conveying; |
6)Finished product stacking and storage. |
Gypsum | 6.8kg/m2 |
Shielding paper | 0.*8kg/m2 |
Modified starch | 0.**5kg/m2 |
Foaming agent | 0.**8kg/m2 |
Glue | 0.**5kg/m2 |
Fiberglass (optional) |
0.**5kg/m2 |
Electricity | 0.3kwh/m2 |
Water | 4.8kg/m2 |
Natural gas(***0kcal/ m3) | **5m³/ m2 |
Coal(***0kcal/ m3) | 0.*9kg/ m2 |
Item | Consumption |
Gypsum powder(semi-hydrated gypsum CaSO4·1/2H2O) | 7.5kg/m2 |
Protective paper | 0.**0.*8kg/m2 |
Gypsum board adhesive | 0.**2kg/m2 |
Foaming agent | 0.**1kg/m2 |
Glue | 0.**5kg/m2 |
Electricity | 0.4kwh/m2 |
Water | 5.**6.2kg/m2 |
Natural gas (***0 kcal/ m3) | 0.*1 m3 /m2 |
Compressed air | 0.*8m3/m2 |
Country: | China |
Model No: | DCI015 |
FOB Price: | 380000 ~ 3e+06 / Set Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 380000 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | seaworthy packing |
Delivery Time: | 4 months |
Supplying Ability: | 4 Set per Year |
Payment Type: | T/T, L/C |
Product Group : | Gypsum board production line |